
Chapter 7 Application Tutorial Installation and Operation Manual
7-40 WiMAX Backhauling Opposite RICi-4T1 Egate-100 Ver. 4.0
• RICi-4E1/T1
• Network management station.
Installing Egate-100
Egate-100 requires no special tools for installation. You need a screwdriver to
mount Egate-100 in a 19-inch rack. You need a screwdriver and drill to mount
Egate-100 on the wall.
Removing/installing the hot-swappable AC/DC units requires a flathead
screwdriver.
Egate-100 comes equipped with an appropriate (country or region dependent)
power cord to be connected from the power socket to the mains.
Refer to
Table
7-1
to determine which cables and connectors are required for
installation.
³ To install Egate-100:
1. Mount the unit.
2. Install fiber optic SFP modules.
3. Connect to channelized T3 equipment.
4. Connect to SDH/SONET equipment.
5. Connect to Gigabit Ethernet equipment.
6. Connect to management stations.
7. Connect to power.
After installing the unit, refer to the section
Configuring the Egate-100
for
configuration instructions.
Mounting the Unit
Egate-100 is designed for installation as a desktop unit or mounted in a rack.
• For rack-mounting instructions, refer to the installation kit manual.
• If Egate-100 is to be used as a desktop unit, place and secure the unit on a
stable, non-movable surface.
Installing Fiber Optic SFP Modules
Egate-100 uses SFP modules with LC fiber optic connectors that provide
hot-swappable industry-standard interfaces.
Third-party SFP optical transceivers must be agency-approved, complying with the
local laser safety regulations for Class 1 laser equipment.
Warning
Comentários a estes Manuais