Equipment List
The following is a list of equipment needed to set up this application:
• Egate-100
• ETX-202A NTU, ICi-E1/T1, RICi-8E1/T1, RICi-16E1/T1
• Network management station
• Network connectors (see
Table
7-1
).
Table
7-1. Required Connectors
Interface Cable/Connector
Control port Straight RS-232/V.24 cable with DB-9 male connector
for ASCII terminal
Fast Ethernet management
port
RJ-45, 8-pin connector
SDH/SONET interfaces LC (SFP) fiber optic connector
Channelized T3 interface BNC connector
Gigabit Ethernet interfaces Electrical: RJ-45, 8-pin connector
Optical: LC (SFP) fiber optic connector
Installing Egate-100
Egate-100 requires no special tools for installation. You need a screwdriver to
mount Egate-100 in a 19-inch rack. You need a screwdriver and drill to mount
Egate-100 on the wall.
Removing/installing the hot-swappable AC/DC units requires a flathead
screwdriver.
Egate-100 comes equipped with an appropriate (country or region dependent)
power cord to be connected from the power socket to the mains.
Refer to
Table
7-1
to determine which cables and connectors are required for
installation.
³ To install Egate-100:
1. Mount the unit.
2. Install fiber optic SFP modules.
3. Connect to channelized T3 equipment.
4. Connect to SDH/SONET equipment.
5. Connect to Gigabit Ethernet equipment.
6. Connect to management stations.
7. Connect to power.