RAD Data comm MBE10-8D Especificações Página 35

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 50
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 34
MBE Family Installation and Operation Manual Chapter 2 Installation
Installation and Setup 2-9
Connecting the Power
AC Power
Supply AC power to the MBE unit through the 1.5m (5 ft) standard power cable
terminated by a standard 3-prong plug. The cable is provided with the unit.
A 2A slow-blow fuse is located in the power supply unit.
To prevent electrical fire hazard, always replace the fuse with the same type
and rating as indicated.
To connect AC power to the MBE unit:
1. Connect the power cable to the power connector on the MBE rear panel.
2. Connect the power cable to the mains outlet.
3. Set the POWER switch to ON.
Warning
Order from: Cutter Networks
Ph:727-398-5252/Fax:727-397-9610
www.bestdatasource.com
Vista de página 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 49 50

Comentários a estes Manuais

Sem comentários